Bathroom Remodeling in Sandy Springs, GA
Tile showers, vanities and the waterproofing nobody sees, built for Sandy Springs bathrooms by a licensed crew.

A bathroom lives or dies on what goes behind the tile. We tear out to the studs, check the subfloor, build the shower pan with a proper slope and waterproof the walls before a single tile goes up. Then come the parts people see: tile, glass, vanity, lighting and fixtures.
In 1960s Sandy Springs homes the baths still have small tiled showers and pink or green fixtures, and a full gut is the honest recommendation. Primary suites, hall baths and powder rooms all run on the same process. Tub to shower conversions, curbless showers and double vanities are the projects we get asked for most, and each one is quoted with the plumbing changes spelled out.
Sandy Springs is about twenty five minutes from our Marietta office across I-285. Relocating a drain, a toilet or a shower valve means a plumbing permit. A refresh in the same layout often does not, and the estimate says which one you are getting. In Sandy Springs, permits go through the City of Sandy Springs.
All about our bathroom remodelingEverything we do in Sandy Springs
Bathroom Remodeling for Sandy Springs homes
Ranches and split levels from the 1960s and 1970s, two story traditionals from the 1980s, and new construction on teardown lots. The older homes are the bulk of our work: closed kitchens, original baths and low ceilings that a smart layout can open up.
Wooded lots near the river and steep driveways are common in Sandy Springs, so access and tree protection are planned before demolition starts.
Bathroom Remodeling We Have Finished
Finished jobs by the same crew that works in Sandy Springs. Open any photo to enlarge it.
Shower pan in pebble mosaic with a corner bench and slate look bathroom floor
Open walk in shower with a tiled half wall and stone curb
Primary bathroom with double vanity, freestanding tub and marble look porcelain floor
Walk in shower and bathroom floor in marble look porcelain with a tiled niche
Walk in shower with large format porcelain, matte black fixtures and a mosaic floor
Tiled shower with corner bench, double niche and pebble mosaic floor
Shower in wood look plank tile with a recessed niche and slate look floor
Brick look tile shower with a corner shelf and mosaic niche
Vertical stacked tile shower with pebble floor and mosaic niche
Black and white geometric mosaic floor tile in a bathroomHow a Sandy Springs project runs
- 01
Walkthrough and estimate
We come to your Sandy Springs home, measure, listen to what you want out of the space and put a written scope and price in your hands. No charge, no obligation.
- 02
Design and selections
Layouts, cabinet doors, stone slabs, tile and fixtures. You pick from what we actually stock and install, so nothing gets specified that cannot be delivered.
- 03
Permits and schedule
Where the job needs a permit we file it with the City of Sandy Springs, book the inspections and lock a calendar with your start and finish dates before anyone swings a hammer.
- 04
Build
One crew leader runs the job and coordinates every trade. You get progress updates and one phone number to call.
- 05
Walkthrough and warranty
We close the punch list with you standing there, hand over the warranty paperwork and clean the site down to the driveway.
Bathroom Remodeling in Sandy Springs: questions we get
A hall bath usually takes two to three weeks on site. A primary bath with a custom shower and new layout runs four to six. Tile and glass lead times are confirmed before we set the start date.
Relocating a drain, a toilet or a shower valve means a plumbing permit. A refresh in the same layout often does not, and the estimate says which one you are getting. In Sandy Springs, that application goes to the City of Sandy Springs.
Yes, it is one of the jobs we do most. We check the drain location and the subfloor first, then build a tiled shower with a low curb or no curb at all where the floor allows.
All of Sandy Springs, including Riverside, Mount Vernon, City Springs, Heards Ferry, Glenridge and Perimeter. We also work in the towns around it, listed at the bottom of this page.
A membrane system over the whole shower, not just a liner at the floor. It costs a little more than the old method and it is the reason a shower does not leak into the room below five years later.
Sandy Springs is about twenty five minutes from our Marietta office across I-285. The first visit and the written estimate are free.
Bathroom Remodeling near Sandy Springs
Planning a bathroom remodel in Sandy Springs?
Tell us what you have in mind and we will walk the space, measure it and put a written price in your hands. No charge.