How long does a whole home renovation take?
Three to six months for a typical single-family home, longer if the structure moves or the house needs rewiring. The sequence is what protects the timeline: everything structural and mechanical first, then inspections, then drywall, then finishes room by room. Kitchens and bathrooms are scheduled last among the finished spaces because their long-lead items arrive last. A schedule that promises all rooms finished at once is a schedule that has not been sequenced.