Flooring Installation in Marietta and Metro Atlanta
Hardwood, tile, laminate and luxury vinyl, installed over a subfloor we have actually checked.

Flooring fails because of what is under it. Moisture in a slab, a subfloor that flexes or a transition that was never planned will telegraph through the best material on the market. We test and prepare first, then lay the floor.
That includes getting the transitions right between rooms, keeping the runs square to the sight lines, and finishing the trim so the job looks intentional at the edges.
How we run it
-
01
Walkthrough and estimate
We measure on site, listen to what you want out of the space, and put a written scope and price in your hands. No charge, no obligation.
-
02
Design and selections
Layouts, finishes, cabinet doors, stone slabs. You pick from what we actually stock and install, so nothing gets specified that cannot be delivered.
-
03
Permits and schedule
We pull the permits, book the inspections and lock a calendar with your start and finish dates on it before anyone swings a hammer.
-
04
Build
One crew leader runs the job and coordinates every trade. You get progress updates and one phone number to call.
-
05
Walkthrough and warranty
We close the punch list with you standing there, hand over the warranty paperwork, and clean the site down to the driveway.
Questions we get asked
Sometimes, with laminate and luxury vinyl over a flat and sound surface. Over tile or a floor with any movement in it, the old material comes up first.
Two to five days for most homes. Tile takes longer because of setting and grout time, and hardwood needs a few days to acclimate before we lay anything.
Yes, standard furniture is included. Pianos, safes and anything that needs specialist handling we flag on the walkthrough.
Planning flooring installation?
Tell us what you have in mind and we will walk the space, measure it and put a written price in your hands. No charge.