Every October we hear the same question: can the kitchen be done by Thanksgiving? Sometimes the honest answer is yes. More often it is that the smartest move is to finish the design and ordering now, enjoy the holidays in the old kitchen, and start demolition in the first week of January.

Here is how to tell which camp your project falls into, what the holiday calendar does to lead times, and how to use the next eight weeks so the remodel moves fast once it starts.

The weeks before demolition decide how fast the rest goes
The weeks before demolition decide how fast the rest goes

What the Holiday Calendar Does to a Remodel

A kitchen remodel is a chain of trades and deliveries: demolition, plumbing and electrical, inspections, cabinets, countertop template, fabrication, install, backsplash, paint. Each link waits on the one before. In November and December that chain slows down in ways that are nobody’s fault. Suppliers close for holiday weeks, inspectors take time off, and freight runs behind.

A project that takes eight weeks in March can stretch to ten or eleven over the holidays, and the stretch tends to land right when you wanted to be cooking. That is why we are careful about promising a holiday finish. The jobs that make it are small in scope, have materials in stock, and start early in the fall.

Can finish by the holidays

Cabinet refacing, a new countertop, a backsplash, new lighting or hardware. Scopes measured in days or a couple of weeks, with materials already available.

Should start in January

Anything that moves walls, plumbing or gas, or needs custom cabinets with a long lead time. Starting late in the fall puts the messiest weeks right on top of the holidays.

Can start now either way

Design, measurements, selections, permits and ordering. None of it touches your kitchen, and all of it shortens the build later.

Using the Next Eight Weeks Well

Finish the design. Layout, appliances, cabinet style and countertop material should be settled before the first wall comes down. Every decision made during construction costs time, and some of them cost money.

Pick appliances early. Appliance sizes drive cabinet sizes. A range that is thirty six inches wide instead of thirty changes the run on both sides. Choosing early also lets you watch for holiday sales, which are real in this category.

Order long lead items. Custom cabinets, special order tile and some fixtures run six to twelve weeks. Ordered in November, they arrive in January ready to install instead of becoming the reason a gutted kitchen sits idle.

Pull permits. Permit review in Cobb County and the surrounding cities takes time, and it moves slower at the end of the year. Submitting in the fall means the permit is in hand on the first day of work.

  • Measure the kitchen and photograph every wall
  • Decide what stays: flooring, windows, appliances
  • Choose cabinet style and finish from real samples
  • Pick the countertop material and edge profile
  • Settle the lighting plan before electrical work begins
  • Set aside a temporary kitchen space for January
  • Plan where the fridge and microwave will live
  • Clear the kitchen and pantry before demolition day
  • Protect floors and furniture in the rooms nearby
  • Agree on a weekly update day with your contractor

If You Do Want a Holiday Finish

Then keep the scope tight. Refacing cabinets instead of replacing them, a new countertop on the existing boxes, a backsplash and updated lighting can transform a kitchen in a couple of weeks without opening a wall. It also leaves a full remodel open for a later year if you want one.

We will tell you at the first visit which scopes can realistically finish before your holiday dates and which cannot. A kitchen renovation planned through the winter and built in the new year is often the calmest way to do it.

Note: Write down the date you actually need the kitchen back, not the date you hope for, and share it with your contractor at the first meeting. A firm date changes how a project is scheduled and ordered. A loose hope does not.

Kitchen Renovation

Plan Now, Build in January

We design the kitchen with you this fall, order everything with a long lead time, and pull the permits so work starts fast in the new year. Marietta and Metro Atlanta.

Frequently Asked Questions About Remodeling Around the Holidays

A full remodel, rarely. A partial update such as a new countertop, backsplash and lighting on existing cabinets often can be. The difference is whether walls, plumbing or cabinets are being replaced.
Yes. Our winters are mild enough that work continues normally, and January and February are often easier to schedule than spring, when many homeowners start projects at once.
Typically six to twelve weeks, depending on the line and the finish. Stock and semi custom lines can be faster. That lead time is the main reason to order in the fall for a January start.
If you are moving plumbing, adding electrical circuits or altering walls, almost always. Swapping cabinets and countertops in place often does not need one. Your contractor should handle the permit and the inspections.
Most families do. Set up a temporary kitchen with the fridge, a microwave and the coffee maker in another room, and expect a few weeks of takeout. Dust barriers keep the rest of the house livable.
Keystone Extreme
Keystone Extreme

Hi, we’re Keystone Extreme

Keystone Extreme Renovations is a licensed general contractor based in Marietta, Georgia, serving Metro Atlanta with full home renovations, kitchens, bathrooms, custom cabinets, countertops, flooring, and roofing. One source, one team, zero stress.

(770) 378-0094

Premium home renovations handled by licensed professionals with 25+ years of hands-on craft. One source. One team. Zero stress.

5.0 on Google

Quick Links

Services

Get in Touch

Call Us
(770) 378-0094
Email
contact@keystoneextreme.com
Service Area
Marietta & Metro Atlanta, GA
Business Hours
Mon – Fri8:00 AM – 6:00 PM
Saturdayby appointment
SundayClosed
© 2026 Keystone Extreme Renovations. All rights reserved.
  • Privacy
  • Terms
  • Licensed & Insured 5.0 on Google Since 1999
    Call now Free Estimate
    Thanksgiving Granite $16/sq ft See details