What is the right order of work in a kitchen remodel?

Design and cabinet order first, because the lead time on cabinets sets the whole schedule. Then demolition, then any framing, then rough plumbing and electrical while the walls are open, then inspection, then drywall and paint, then flooring, then cabinets, then countertop templating, then the countertop, then the backsplash, then plumbing and electrical trim, then appliances. Flooring before cabinets is deliberate: it lets an appliance be replaced later without a lip at the edge of the opening.

Still not sure how it applies to your house? Ask us and get a real number back.

(770) 378-0094

More about Kitchen Renovation

All questions

Premium home renovations handled by licensed professionals with 25+ years of hands-on craft. One source. One team. Zero stress.

5.0 on Google

Quick Links

Services

Get in Touch

Call Us
(770) 378-0094
Email
contact@keystoneextreme.com
Service Area
Marietta & Metro Atlanta, GA
Business Hours
Mon – Fri8:00 AM – 6:00 PM
Saturdayby appointment
SundayClosed
© 2026 Keystone Extreme Renovations. All rights reserved.
  • Privacy
  • Terms
  • Licensed & Insured 5.0 on Google Since 1999
    Call now Free Estimate